Assembly Procedure for Item FBD28 Series Optional Parts:
NOTICE: Shut off gas heater during the following blower installation.
Figure 1 Remove up
per fire box by
unscrewing left/right screws on the
fire box.
Figure 2 Unscrew two screws on
heat insulation board cover and
draw it out.
.
Figure 3 Fix temper
ature sensor to
heat insulation board cover as
shown in the figure.
Figure 4 Insert wires into the space
between wire protecting board and
shell; Fix the wires to the top cover
with wire fixture.
Wire Fixture
Figure 5 Connect temperature sensor
with lead; Install the cover according to
Figure 2, then fix the upper fire box
according to Figure 1.
Figure 6 Insert blower assembly into
the bottom space of burner pan
according to Figure 7. Pay attention
not to touch wires inside.
Figure 7 Set Blower plane and fix it
onto two brackets of shell board.
Please refer to Figure 6. Make sure
Blower is installed into the slots.
Install Bower
into slots
Figure 8 Fix Blower with
one screw,
after manually install it into slots.
Figure 9 Fix the wires, which is
matched with metal wafer, to the
shell with three screws.